The practical answer
Apartment EV charging is mostly a permissions and infrastructure problem. The reliable paths are assigned-space Level 2, shared managed charging, workplace/public routine charging, or a safe portable setup where the building allows it. Extension-cord improvisation is not a plan.
Decision path
- Document parking ownership, outlet access, and building rules.
- Ask about assigned-space installation, metering, and load management.
- Use portable charging only where the outlet and rules support it safely.
- Build a fallback routine around public or workplace charging if home installation is blocked.